Photo archive · By subject

Hull planking and gun ports

387 photos. Photos with a log post open that post; the others open large.

March 2017

Build photo of the HMS Diana model, 2017-03-10 Build photo of the HMS Diana model, 2017-03-11 The keel former, set up on a board Build photo of the HMS Diana model, 2017-03-12 Port, the same situation The quarterdeck, where nothing has been filed yet Build photo of the HMS Diana model, 2017-03-18 Build photo of the HMS Diana model, 2017-03-18 The false deck after repair and sanding The stern from below: there's a slight kink in the hull here Build photo of the HMS Diana model, 2017-03-19 Build photo of the HMS Diana model, 2017-03-25 Build photo of the HMS Diana model, 2017-03-25 The first halves of the margin plank, reasonably symmetrical Build photo of the HMS Diana model, 2017-03-30 Build photo of the HMS Diana model, 2017-03-30 Build photo of the HMS Diana model, 2017-03-30 Build photo of the HMS Diana model, 2017-03-30 Build photo of the HMS Diana model, 2017-03-30 Build photo of the HMS Diana model, 2017-03-30 Overview of the complete margin plank on the gun deck This part tapers off by 0.6 mm

April 2017

Build photo of the HMS Diana model, 2017-04-01 Build photo of the HMS Diana model, 2017-04-01 Build photo of the HMS Diana model, 2017-04-01 Build photo of the HMS Diana model, 2017-04-01 Build photo of the HMS Diana model, 2017-04-01 Build photo of the HMS Diana model, 2017-04-01 The first planks on the deck, against the margin plank Build photo of the HMS Diana model, 2017-04-02

July 2017

Build photo of the HMS Diana model, 2017-07-01 Build photo of the HMS Diana model, 2017-07-01 Build photo of the HMS Diana model, 2017-07-01 Build photo of the HMS Diana model, 2017-07-01 Build photo of the HMS Diana model, 2017-07-01 Build photo of the HMS Diana model, 2017-07-01 The first half of the gun deck planked, the other half still bare

September 2017

Build photo of the HMS Diana model, 2017-09-23 Build photo of the HMS Diana model, 2017-09-23 The bow with the margin plank and the joggling Build photo of the HMS Diana model, 2017-09-24 Every clamp I own on it Build photo of the HMS Diana model, 2017-09-24 Build photo of the HMS Diana model, 2017-09-24 Build photo of the HMS Diana model, 2017-09-24 The inner bulwark on the starboard side The stern with the inner bulwark Build photo of the HMS Diana model, 2017-09-26

December 2017

Build photo of the HMS Diana model, 2017-12-28 The upper deck meets the top plank Build photo of the HMS Diana model, 2017-12-31

January 2018

A port after cutting, before final sanding Build photo of the HMS Diana model, 2018-01-02 Build photo of the HMS Diana model, 2018-01-02 Build photo of the HMS Diana model, 2018-01-02 Build photo of the HMS Diana model, 2018-01-02 Trial fit with a gun at the aftermost ports At the middle ports the barrel comes out far too high The height difference between deck and port The barrel at an acceptable height Both sides to size Build photo of the HMS Diana model, 2018-01-04 The gun carriage with the axletrees set deeper The barrel now sits lower in the port The insides of the ports on the port side Build photo of the HMS Diana model, 2018-01-05 All the port linings fitted Build photo of the HMS Diana model, 2018-01-07 The linings sanded smooth, ready for paint The first coat of red ochre Build photo of the HMS Diana model, 2018-01-08 Build photo of the HMS Diana model, 2018-01-16

March 2018

Build photo of the HMS Diana model, 2018-03-11 Build photo of the HMS Diana model, 2018-03-11 The first strips of the first planking on the starboard side The same state of affairs on the port side The sternpost, where a few strips may be too short Build photo of the HMS Diana model, 2018-03-17 Build photo of the HMS Diana model, 2018-03-17 Build photo of the HMS Diana model, 2018-03-17 Build photo of the HMS Diana model, 2018-03-23 Starboard nearly closed, one strip to go Build photo of the HMS Diana model, 2018-03-25 Build photo of the HMS Diana model, 2018-03-25 The last strip fits exactly The first side of the first planking closed The bow, with a small kink in the curve Build photo of the HMS Diana model, 2018-03-25 Build photo of the HMS Diana model, 2018-03-25 Build photo of the HMS Diana model, 2018-03-25 The line of the bow transferred with the callipers

April 2018

Build photo of the HMS Diana model, 2018-04-01 Build photo of the HMS Diana model, 2018-04-01 Build photo of the HMS Diana model, 2018-04-01 Build photo of the HMS Diana model, 2018-04-01 The hull after sanding, starboard The bow The sternpost The keel from below Overview of the sanded hull Build photo of the HMS Diana model, 2018-04-01 The bow in different light: the port side has a kink Comparison of the two bow curves The Caldercraft cradle, far too big Build photo of the HMS Diana model, 2018-04-02 The counter planking with the helm port Build photo of the HMS Diana model, 2018-04-02 Build photo of the HMS Diana model, 2018-04-05 The space between the counter planking and the bottom of the transom The same from the side The planking can't go any further aft Dropping the lower part of the transom The transom fitted lower and joined up Build photo of the HMS Diana model, 2018-04-08 The distance between port and wale taken from the profile view The top of the wale marked out Build photo of the HMS Diana model, 2018-04-08 The first plank of the second planking Both sides at equal height, despite the shadow Build photo of the HMS Diana model, 2018-04-10 The second planking after a few evenings Build photo of the HMS Diana model, 2018-04-13 Build photo of the HMS Diana model, 2018-04-14 Build photo of the HMS Diana model, 2018-04-15 Build photo of the HMS Diana model, 2018-04-15 Starboard closed up past the gunports The ports in the second planking The bow The stern The transition to the bulwark halfway across a plank The planks off and relaid, now tapered The tapered planks follow the sheer Exactly a whole number of planks now fits above Build photo of the HMS Diana model, 2018-04-19 Starboard closed above the wale Detail with the tiny gaps between the planks Build photo of the HMS Diana model, 2018-04-26 Build photo of the HMS Diana model, 2018-04-26 Build photo of the HMS Diana model, 2018-04-27 Build photo of the HMS Diana model, 2018-04-28 Port side closed from the wale upwards The stern on the port side The bow, where the gaps still need filling Build photo of the HMS Diana model, 2018-04-29 Build photo of the HMS Diana model, 2018-04-29 Build photo of the HMS Diana model, 2018-04-29 Crop after filling the gaps

May 2018

Build photo of the HMS Diana model, 2018-05-03 Build photo of the HMS Diana model, 2018-05-03 Build photo of the HMS Diana model, 2018-05-03 The garboard strake along the keel The garboard strake at the bow, tapered on the keel side The first stealer at the sternpost, soon to be under the wale The first drop plank at the bow, still unsanded Crop from Piet's log: drop planks and tapering combined? My own drop plank, marked in red Build photo of the HMS Diana model, 2018-05-17 Build photo of the HMS Diana model, 2018-05-17 The drop plank to the English system reveals the gap Everything meets without pushing Step 1: masking tape where the drop plank will go Step 3: the upper plank cut to size Step 4: dry fit on the masking tape Step 5: the tape cut along the underside of the drop plank The remaining piece of tape as a template Step 8: dry fit, everything fits Build photo of the HMS Diana model, 2018-05-19 The sternpost, all planks tapered The drop plank glued, drawing pins still in place Build photo of the HMS Diana model, 2018-05-19 Build photo of the HMS Diana model, 2018-05-20 Build photo of the HMS Diana model, 2018-05-22 Build photo of the HMS Diana model, 2018-05-22 Build photo of the HMS Diana model, 2018-05-22 The stealer itself The stealer together with the glued strip Build photo of the HMS Diana model, 2018-05-24

June 2018

Build photo of the HMS Diana model, 2018-06-08 Build photo of the HMS Diana model, 2018-06-08

August 2018

Build photo of the HMS Diana model, 2018-08-20 Build photo of the HMS Diana model, 2018-08-24 Build photo of the HMS Diana model, 2018-08-25 Build photo of the HMS Diana model, 2018-08-25 Build photo of the HMS Diana model, 2018-08-26

September 2018

Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Build photo of the HMS Diana model, 2018-09-08 Port side of the second planking closed The bow with the drop planks The underwater hull from the side The sternpost with four stealers Detail of the stealers Build photo of the HMS Diana model, 2018-09-09 Build photo of the HMS Diana model, 2018-09-09 Build photo of the HMS Diana model, 2018-09-09 Build photo of the HMS Diana model, 2018-09-09 Build photo of the HMS Diana model, 2018-09-09 Starboard divided into four belts, seven planks per belt The stealer at the sternpost on the starboard side Build photo of the HMS Diana model, 2018-09-09 Build photo of the HMS Diana model, 2018-09-09 Build photo of the HMS Diana model, 2018-09-23 Build photo of the HMS Diana model, 2018-09-23

November 2018

Build photo of the HMS Diana model, 2018-11-03 Build photo of the HMS Diana model, 2018-11-03 Build photo of the HMS Diana model, 2018-11-03 Build photo of the HMS Diana model, 2018-11-03 Build photo of the HMS Diana model, 2018-11-03 Build photo of the HMS Diana model, 2018-11-03 Build photo of the HMS Diana model, 2018-11-03 Build photo of the HMS Diana model, 2018-11-03 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-04 Build photo of the HMS Diana model, 2018-11-17 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 The stern when it had just been finished, still unsanded From about this point, full-width planks again The state of play, with drawing pins The stealer fixed; one more is needed Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 Build photo of the HMS Diana model, 2018-11-18 The second planking completely closed Start of sanding the sternpost

December 2018

Build photo of the HMS Diana model, 2018-12-01 Build photo of the HMS Diana model, 2018-12-01 Build photo of the HMS Diana model, 2018-12-01 Build photo of the HMS Diana model, 2018-12-01 Build photo of the HMS Diana model, 2018-12-01 Build photo of the HMS Diana model, 2018-12-01 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Build photo of the HMS Diana model, 2018-12-02 Port side with the black strake Seen from the bow, the black strakes sit at the same height on both sides Overview of the hull with the first strip of the wale Build photo of the HMS Diana model, 2018-12-03 Build photo of the HMS Diana model, 2018-12-03 Build photo of the HMS Diana model, 2018-12-03 Build photo of the HMS Diana model, 2018-12-03 Build photo of the HMS Diana model, 2018-12-03 Build photo of the HMS Diana model, 2018-12-03 Build photo of the HMS Diana model, 2018-12-04 Build photo of the HMS Diana model, 2018-12-04 Build photo of the HMS Diana model, 2018-12-04 Build photo of the HMS Diana model, 2018-12-04 Build photo of the HMS Diana model, 2018-12-04 Build photo of the HMS Diana model, 2018-12-04 Build photo of the HMS Diana model, 2018-12-04 The complete wale, in poor light The wale towards the sternpost The wale towards the bow The black strake thinned down slightly: the difference in thickness is now visible Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 Build photo of the HMS Diana model, 2018-12-08 The wale in three coats of matt black The transom dry-fitted From above: the kink in the middle Build photo of the HMS Diana model, 2018-12-08 After filing, the transom fits snugly all round Build photo of the HMS Diana model, 2018-12-08 The first quarter gallery, dry-fitted Build photo of the HMS Diana model, 2018-12-09 Build photo of the HMS Diana model, 2018-12-09 The first gallery after turning it round Build photo of the HMS Diana model, 2018-12-09 Build photo of the HMS Diana model, 2018-12-09 Build photo of the HMS Diana model, 2018-12-09 Build photo of the HMS Diana model, 2018-12-09 Dry fit of the top of the first quarter gallery The transom glued Build photo of the HMS Diana model, 2018-12-09 Build photo of the HMS Diana model, 2018-12-09 Build photo of the HMS Diana model, 2018-12-09 The continuous line from transom to gallery (photo taken upside down, hence the odd light) The same underside from a different angle Build photo of the HMS Diana model, 2018-12-09 The angular shape of the gallery Build photo of the HMS Diana model, 2018-12-10 Build photo of the HMS Diana model, 2018-12-10 Build photo of the HMS Diana model, 2018-12-10 Build photo of the HMS Diana model, 2018-12-10 Build photo of the HMS Diana model, 2018-12-10 Build photo of the HMS Diana model, 2018-12-10 Build photo of the HMS Diana model, 2018-12-10 Left-hand gallery with decoration Right-hand gallery, still without decoration Build photo of the HMS Diana model, 2018-12-16 The white ornament as supplied The mouldings with the red line, painted with the brush Build photo of the HMS Diana model, 2018-12-23 Build photo of the HMS Diana model, 2018-12-23 Build photo of the HMS Diana model, 2018-12-23 The difference in thickness between the planked after part and the unplanked forward part of the keel The underside of the keel Build photo of the HMS Diana model, 2018-12-23 Build photo of the HMS Diana model, 2018-12-23 Tool for drawing the horizontal line Tape above the waterline The taped-off waterline Build photo of the HMS Diana model, 2018-12-23 Build photo of the HMS Diana model, 2018-12-23 The first plates at the keel The first rows along the keel on 24 December Build photo of the HMS Diana model, 2018-12-25 The keel, bare and shallow Build photo of the HMS Diana model, 2018-12-27 The strip of wood that deepens the keel, still loose in place Rudder and sternpost taper from the waterline down, as in the Anatomy book Build photo of the HMS Diana model, 2018-12-27 Build photo of the HMS Diana model, 2018-12-27 The taped-off belt, seen from astern The deepened keel is on Belts on the hull, marked out from the template Belt 2 sits at 12 widths from the garboard strake at the bottom Build photo of the HMS Diana model, 2018-12-27 A section of the keel coppered, exactly one plate wide The rudder planked Build photo of the HMS Diana model, 2018-12-28 Build photo of the HMS Diana model, 2018-12-30 Build photo of the HMS Diana model, 2018-12-30 The new start along the waterline

January 2019

Build photo of the HMS Diana model, 2019-01-13

February 2019

After relaying, the waterline runs straight again