Photo archive · By subject

Bow, head and mouldings

109 photos. Photos with a log post open that post; the others open large.

March 2018

The bow, still unsanded

April 2018

Build photo of the HMS Diana model, 2018-04-01 Build photo of the HMS Diana model, 2018-04-05 The transom aligned as per the instructions The side, which the second planking will close up later Build photo of the HMS Diana model, 2018-04-08 Masking tape where the wale will go The line of the wale along the whole length Build photo of the HMS Diana model, 2018-04-08 Build photo of the HMS Diana model, 2018-04-08 Build photo of the HMS Diana model, 2018-04-08

December 2018

The second gallery clearly sits better Build photo of the HMS Diana model, 2018-12-09 After filing: the arm has a bend again Build photo of the HMS Diana model, 2018-12-17 Without wash: bling Both figures after restoration Build photo of the HMS Diana model, 2018-12-27 The chosen belt taped off on both sides with masking tape Build photo of the HMS Diana model, 2018-12-30 Build photo of the HMS Diana model, 2018-12-30 Build photo of the HMS Diana model, 2018-12-30 Paper strips on the hull: the gore lines are now clearly visible Build photo of the HMS Diana model, 2018-12-30 Build photo of the HMS Diana model, 2018-12-30 Build photo of the HMS Diana model, 2018-12-30

March 2019

Build photo of the HMS Diana model, 2019-03-23 Build photo of the HMS Diana model, 2019-03-23 Build photo of the HMS Diana model, 2019-03-24 Build photo of the HMS Diana model, 2019-03-24 Build photo of the HMS Diana model, 2019-03-24 Build photo of the HMS Diana model, 2019-03-24 The stern with the quarter gallery

September 2019

Build photo of the HMS Diana model, 2019-09-15 The side steps on the starboard side between the fenders The steps in the colour of the hull behind them The top moulding at the bow, with a row of clamps The same moulding seen from above; the curve was put in beforehand Following the lower curve: the moulding sticks out a long way Build photo of the HMS Diana model, 2019-09-29

October 2019

Build photo of the HMS Diana model, 2019-10-05 Build photo of the HMS Diana model, 2019-10-06 The bow on the port side with the mouldings The mouldings run on to the gunports The bow from the front, with the mouldings parallel around the curve Build photo of the HMS Diana model, 2019-10-06 The bow with the first parts of the head, dry fitted From the front: the first part against the stem Side view of the bow with the head part The head from the side, all still dry fitted Top view: there is a gap between the bow and the gratings From above once more, with the side pieces in place

November 2019

Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 Build photo of the HMS Diana model, 2019-11-03 The head from above, with the new grating running to the bow The head from the side on the port side Starboard side of the head Build photo of the HMS Diana model, 2019-11-09 Build photo of the HMS Diana model, 2019-11-09 The bowsprit fitted, with the figurehead beneath it The cathead on the port side, from the side The final grating at the bow

December 2019

Build photo of the HMS Diana model, 2019-12-07 Build photo of the HMS Diana model, 2019-12-07 Small brass pieces as hinges against the hull Build photo of the HMS Diana model, 2019-12-24 Build photo of the HMS Diana model, 2019-12-24 Build photo of the HMS Diana model, 2019-12-24 Build photo of the HMS Diana model, 2019-12-24 The head from the front, with the figurehead still unpainted The rails of the head, neatly in line at the front Gold carvings and the gold line on the blue trim pieces The head seen from the side The fitting with the hawse holes is too tall to go under the headrails Build photo of the HMS Diana model, 2019-12-26 The hawse holes, now at gun deck level The rope supplied in the kit is right-hand laid

January 2020

The rear of the barrels with the cut-through breeching rings The guns on the port side

February 2020

Build photo of the HMS Diana model, 2020-02-08

March 2020

Build photo of the HMS Diana model, 2020-03-08

October 2020

Build photo of the HMS Diana model, 2020-10-04

January 2021

Build photo of the HMS Diana model, 2021-01-24

February 2021

The lower part of the planksheer aft, with open rail The first rail aft on the stanchions The rail from the side

September 2021

The quarterdeck with the second rail The new walnut display stand, in Osmo gloss oil

October 2021

Build photo of the HMS Diana model, 2021-10-02 Build photo of the HMS Diana model, 2021-10-02

January 2022

Build photo of the HMS Diana model, 2022-01-09

December 2022

Build photo of the HMS Diana model, 2022-12-09

April 2023

Build photo of the HMS Diana model, 2023-04-27

October 2023

Build photo of the HMS Diana model, 2023-10-13

September 2024

The forecastle from above, with the carronades on their slides and the 9-pounders behind them

January 2025

The hammock cranes with nettings on the Victory

August 2025

Build photo of the HMS Diana model, 2025-08-23 Build photo of the HMS Diana model, 2025-08-27

September 2025

Build photo of the HMS Diana model, 2025-09-21