Build log · Phase 13, Hammock cranes

All the nettings secured, now the two hundred hammocks

21 September 2025 · Milestone · How-to · Problem and fix

The hammock nettings are now all in place. It took some effort before I had a method for attaching them to the horizontal rope. In the end I use a small whipping round the rope, through which I pull the thread of the netting with a loop so that it is held fast.

The small whipping that holds the netting to the horizontal rope
The small whipping that holds the netting to the horizontal rope

Now I have started on the hammocks themselves. I drilled seven holes in a strip of wood and pushed seven pins through them. The strip goes in the vice, I press the rolled-up hammock onto the pins and can then wind the rope round it. After that the roll is folded up, and it is ready to go into the netting.

One hammock of the two hundred: strip of cloth, roll it, onto the batten with seven pins, seven turns of thread, finish under four turns, a drop of superglue. Recorded 11 September 2026, 2:27, 26 MB.
What is said

The Diana carries two hundred hammocks, rolled up in the nettings along the bulwark. This is one of them. I start with a strip of cloth, four by three centimetres. One edge of the strip was hemmed beforehand. That edge goes on the outside, so no frayed edge shows on the ship. I roll the cloth as tightly as I can, into a roll about as thick as a match. The batten in the vice has seven pins. I press the roll onto them, so it cannot move and the pins mark where the thread goes. Then the lashing, with fine thread. I start with two turns round the roll and pass the thread through them, so it forms a small knot that cannot slip. Then one turn between each pair of pins, pulling tight every time. Seven turns in all. On a real hammock that was the rule, one for each of the seven seas, or so the story goes. At the end, two turns again with the thread passed through. Then I take the roll off the pins and pass the needle under four of the turns, so it holds without a bulky knot. I cut the thread on both sides, and trim the ends once more, so it is neatly finished. A drop of superglue in the middle, so I can fold the hammock double without it springing open. And that is one. One hundred and ninety-nine to go.

The strip with seven pins, with the hammock pressed onto it
The strip with seven pins, with the hammock pressed onto it
The result once the rope is round it
The result once the rope is round it
The folded hammock, ready to go into the netting
The folded hammock, ready to go into the netting

Scheepshoorn is about as far along with his Victory as I am with the Diana, although he is actually a little further ahead, and his Victory looks magnificent. Before I have those two hundred hammocks finished I shall certainly be busy for a while. Masts and rigging only come after that. (Postscript, September 2026: not straight away. The manual puts a few things before the masts: the deadeyes with their chainplates under the channels, the holes in the bulwarks that the sheets and braces will pass through, and the four boats for the waist. Only then the spars of sheet 3.)