All three hatches on the deck
The first hatch with its ladder has been glued to the deck. A week ago I consulted the forum about the deck beam that ran underneath this hatch. Piet had advised leaving it in place and hiding it with strips of veneer; Hans thought sawing it out was no problem as long as the deck was firmly attached. I removed the supporting beam after all and covered the sides with a thin strip of wood. The sides of the hatch now run straight through and it made for a neater whole, I thought.


After that things went quickly. An hour later all three hatches were ready and fixed in place: the gratings in their coamings, the shot garlands around them and, at the middle hatch, the ladder going down.



The next job is finishing the head, with Diana’s figurehead. That had been waiting for parts for a while, but they have since arrived from England, so I can carry on.